Project Name: Wuhan Kangning Project
Project location: Wuhan
Customer Introduction:
Kangning 10.5 Generation Glass Substrate Project is located in Dongxihu District, Wuhan City, covering an area of 236 acres, with a phase I investment of approximately $1.3-14 billion. After the project is completed and put into operation, it will fully meet the needs of BOE Wuhan's 10.5 generation LCD panel production line and contribute to improving the quality and efficiency of the LCD panel industry chain in Hubei Province.
Project Summary:
The company has professionally contracted the construction and installation of the central air-conditioning system pipeline for the project, with a total of 7 floors of factory buildings and a construction area of about 170000 m2. The refrigeration host uses a total of 6 Yorkshire centrifugal compressor units, with over 40 combined purification air cabinets, over 120 floor mounted air conditioning cabinets, and over 400 fan coil units (office areas) at the end. The refrigeration pipeline is about 45000 meters long.
Scan and access mobile stations
Follow WeChat official account